Add to Favorites
Share

JCSD-1T

  • Description
Product Detail

    1 the operator should be familiar with the general performance and structure of the oil pressure machine, prohibit the use of overload.

    2 before use, should be lubricated by the provisions of the oil, check the high-pressure pump, pressure gauge, all kinds of valve, sealing ring, etc..

    3 before starting, should check whether the mold is complete, whether the material is in line with the requirements, said the material tool is accurate.

    4 pressing, touch must be placed on the plate center position, prohibit the use of eccentric. Before each shift, the test pressure should be checked once the mold is cracked.

    More than 5 people, to have someone to start, coordinate and cooperate with each other.

    6 no hands, head between the die and the pressure head.

    7 the work is finished, should be the products, tools, mold finishing well and placed in the designated place.


Send your message to this supplier
To:  

YOU Hydraulic Machine Co., Ltd.

* Content:  

For better quotations, include:

- A self introduction

- Special requests, if any

Quantity:  

  
You May Like
Not exactly what you want? One request, multiple quotations Get Quotations Now >>