JCQ-20TS
-
Payment
-
Origin
China Mainland
-
Minimum Order
15
-
Packing
Pieces
- Contact Now Start Order
- Description
Product Detail
1 the operator should be familiar with the general performance and structure of the oil pressure machine, prohibit the use of overload.
2 before use, should be lubricated by the provisions of the oil, check the high-pressure pump, pressure gauge, all kinds of valve, sealing ring, etc..
3 before starting, should check whether the mold is complete, whether the material is in line with the requirements, said the material tool is accurate.
4 pressing, touch must be placed on the plate center position, prohibit the use of eccentric. Before each shift, the test pressure should be checked once the mold is cracked.
More than 5 people, to have someone to start, coordinate and cooperate with each other.
6 no hands, head between the die and the pressure head.
7 the work is finished, should be the products, tools, mold finishing well and placed in the designated place.
- JCQ-80TS 15 Pieces / (Min. Order)
- JCSD-1T 15 Pieces / (Min. Order)
- JCZD 1 15 Pieces / (Min. Order)
- JCQ-80TS 15 Pieces / (Min. Order)
- JCSD-1T 15 Pieces / (Min. Order)
- JCZD 1 15 Pieces / (Min. Order)
- JG-JH 15 Pieces / (Min. Order)
- JCAP 1 15 Pieces / (Min. Order)
- JCCL-10T 15 Pieces / (Min. Order)
- JCCQ 6 15 Pieces / (Min. Order)
- JCH-10T 15 Pieces / (Min. Order)
- JC530 15 Pieces / (Min. Order)
- JC530-10TS1 15 Pieces / (Min. Order)
- JC530-13TS 15 Pieces / (Min. Order)
- JC530-10TS 15 Pieces / (Min. Order)
- JB04 Series 15 Pieces / (Min. Order)
- TUP-3T5T 15 Pieces / (Min. Order)